7kW On-Grid Solar System Hyderabad | Save ₹85,000+ Yearly with ₹78,000 Subsidy

7kW On-Grid Solar System Hyderabad

The Perfect Mid-Size Solution for Modern Indian Homes

Are you watching your monthly electricity bill cross ₹4,000-6,000 every single month? Do you run 1-2 air conditioners during Hyderabad’s scorching summers and find your TSSPDCL or TSNPDCL bills spiking to ₹8,000+ during peak months? You’re experiencing what hundreds of thousands of Hyderabad homeowners face—the relentless burden of rising electricity tariffs eating into your monthly budget.

A 7kW on-grid solar system is the goldilocks solution—not too small, not too large, but just right for most 3BHK homes and small villas in Hyderabad. This powerhouse generates 28-32 units of clean electricity daily, enough to run your air conditioners guilt-free, power all your appliances simultaneously, and slash your electricity bills by 70-85%. With Hyderabad’s exceptional solar irradiance averaging 5.5 kWh/m²/day and 280+ sunny days annually, your rooftop becomes a reliable income-generating asset that pays you back month after month.

This isn’t just another expense—it’s a strategic investment that delivers 400-500% returns over 25 years. In this comprehensive guide, you’ll discover exactly what a 7kW on-grid solar system costs in Hyderabad (₹3.62-4.62 lakh after subsidy), how much you’ll actually save (₹85,000-1,10,000 annually), the best components for local climate conditions, real ROI calculations, and how to navigate TSSPDCL/TSNPDCL net metering approvals seamlessly.

Whether you’re in Banjara Hills, Kondapur, Miyapur, or anywhere across Telangana, this guide will help you make the smartest energy decision for your family.

Estimated System Cost: ₹3,62,000 – ₹4,62,000 (After ₹78,000 Subsidy)

[Get 3 Free Quotes from Verified Hyderabad Installers]


System Specifications: 7kW On-Grid Solar System Hyderabad

ComponentSpecification
System Capacity7kW (7,000 Watts)
Solar Panels19-22 panels (330-370W each)
Inverter Type7kW String Inverter (On-Grid)
Mounting StructureHot-dip galvanized, wind-load rated
Rooftop Space Required550-700 sq ft (shadow-free)
Daily Generation (Average)28-32 kWh/day
Monthly Generation840-1,000 units/month
Annual Generation10,080-12,000 units/year
PM Surya Ghar Subsidy₹78,000 (Fixed for 3kW+)
Payback Period4-5 years
System Lifespan25+ years
Net Metering EligibilityYes (TSSPDCL/TSNPDCL)

Why This Matters: In Hyderabad’s climate with 5.5 peak sun hours daily, a 7kW system generates enough power to offset ₹7,000-10,000 monthly bills. That’s ₹84,000 to ₹1,20,000 in annual savings—your investment pays for itself in just 4-5 years.

[Insert Image: 7kW solar panel array installed on 3BHK Hyderabad home rooftop]


Complete Price Breakdown: 7kW On-Grid Solar System Hyderabad (2025)

Understanding every rupee of your investment ensures you get maximum value. Here’s the transparent, component-wise cost structure for a quality 7kW on-grid solar system in Hyderabad:

ItemCost Range (₹)Notes
Solar Panels (7kW)₹1,54,000 – ₹1,96,000Mono PERC/N-Type, ALMM-listed
7kW String Inverter₹56,000 – ₹84,000On-grid, 97-98% efficiency
Mounting Structure₹42,000 – ₹56,000Wind-rated, corrosion-resistant
Cables & Wiring (DC/AC)₹24,500 – ₹31,500UV-resistant, ISI-marked
Installation & Labor₹35,000 – ₹49,000Includes rooftop prep, safety
Net Metering Setup₹8,400 – ₹12,600Bi-directional meter, DISCOM fees
MCB, Junction Boxes, LA₹12,600 – ₹17,500Protection equipment
Earthing & Commissioning₹10,500 – ₹14,000As per CEA standards
TOTAL (Before Subsidy)₹4,40,000 – ₹5,40,000Complete turnkey installation
PM Surya Ghar Subsidy-₹78,000Maximum for systems above 3kW
FINAL COST₹3,62,000 – ₹4,62,000After government subsidy

Important Note on Subsidy for 7kW Systems

Under the PM Surya Ghar Muft Bijli Yojana, residential consumers receive Central Financial Assistance (CFA) capped at ₹78,000. The subsidy structure is:

  • Up to 2kW: ₹30,000 per kW (60% of benchmark cost) = ₹60,000
  • 2-3kW (Additional 1kW): ₹18,000 (40% of benchmark cost)
  • Total Maximum Subsidy: ₹78,000 (capped at 3kW capacity)

For a 7kW system, you receive the maximum ₹78,000 subsidy—the same amount as a 3kW, 5kW, or 10kW system. While systems above 3kW get partial subsidy coverage, you benefit from economies of scale with lower per-kW costs on larger installations.

[Add Data Source: https://pmsuryaghar.gov.in – PM Surya Ghar Official Portal]

[Insert Infographic: Visual pie chart showing cost breakdown with subsidy impact]


Best Solar Panels for 7kW On-Grid Solar System Hyderabad

Selecting panels optimized for Hyderabad’s climate—intense summer heat (40°C+), moderate monsoon humidity, and excellent year-round irradiance—is critical for 25-year performance. Here are the top options:

Premium Tier (Highest Efficiency)

Waaree Energies WS-535 (Mono Bifacial)

  • Price: ₹8,800-9,200/panel | Panels Needed: 13-14 panels
  • Efficiency: 21.2% | Temperature Coefficient: -0.37%/°C
  • Why Choose: India’s largest manufacturer, exceptional bifacial gain on white rooftops, 27-year warranty
  • Hyderabad Advantage: Performs exceptionally in high-heat conditions with minimal degradation

Adani Solar A-Series (N-Type TOPCon)

  • Price: ₹9,500-10,200/panel | Panels Needed: 13 panels (540W)
  • Efficiency: 22.1% | Temperature Coefficient: -0.29%/°C
  • Why Choose: Next-gen TOPCon technology, superior low-light performance during monsoons
  • Hyderabad Advantage: Maintains higher efficiency during cloudy days

Tata Power Solar (Mono PERC 500W)

  • Price: ₹8,500-9,000/panel | Panels Needed: 14 panels
  • Efficiency: 20.8% | Temperature Coefficient: -0.38%/°C
  • Why Choose: Trusted brand, extensive Telangana service network
  • Hyderabad Advantage: Local service centers ensure quick warranty claims

Mid-Range (Best Value)

Luminous L-Series (Mono PERC Half-Cut 475W)

  • Price: ₹7,800-8,200/panel | Panels Needed: 15 panels
  • Efficiency: 19.8% | Temperature Coefficient: -0.40%/°C
  • Why Choose: Half-cut cells reduce hot-spot effects, proven reliability
  • Best For: Budget-conscious buyers wanting quality performance

Vikram Solar Eldora (Mono PERC 455W)

  • Price: ₹7,500-8,000/panel | Panels Needed: 16 panels
  • Efficiency: 19.5% | Temperature Coefficient: -0.41%/°C
  • Why Choose: Strong South Indian presence, good warranty support
  • Best For: Value-focused installations seeking Indian manufacturing

Budget Tier (Entry-Level Quality)

Renewsys (Mono PERC 435W)

  • Price: ₹6,800-7,200/panel | Panels Needed: 17 panels
  • Efficiency: 18.7% | Temperature Coefficient: -0.42%/°C
  • Why Choose: Most affordable ALMM-listed option
  • Best For: Tight budgets while maintaining subsidy eligibility

Critical Selection Criteria for Hyderabad

  1. Temperature Coefficient: Hyderabad rooftops reach 65-70°C in summer. A panel with -0.37%/°C vs -0.42%/°C saves 12-15 units monthly in peak summer.
  2. ALMM Listing: Mandatory for ₹78,000 subsidy. All recommended panels are ALMM-approved as of December 2025.
  3. PID Resistance: Monsoon humidity (70-80%) requires PID-resistant panels. Premium options include anti-PID coating.
  4. Wind Load Rating: Must withstand 60-80 km/h storm winds. Look for IEC 61215 with 2,400 Pa certification.
  5. Local Service: Brands with Hyderabad presence (Waaree, Tata, Luminous) offer faster response for issues.

[Compare All Solar Panel Brands]

[Insert Image: Comparison showing Mono PERC vs Bifacial panel performance in Hyderabad conditions]


Best Inverters for 7kW On-Grid Solar System Hyderabad

Your inverter manages DC-to-AC conversion and grid synchronization—choosing the right one ensures maximum generation and longevity. Here are proven performers:

Premium String Inverters

SolarEdge SE7K-INS (HD-Wave Technology)

  • Price: ₹73,500-80,500
  • Efficiency: 97.6% (weighted) | Max: 99%
  • Key Features:
    • Module-level SafeDC™ shutdown
    • Advanced monitoring via app
    • 12-year standard warranty (extendable to 25 years)
    • Excellent partial shading tolerance
  • Best For: Tech-savvy homes wanting maximum safety and real-time control

Fronius Symo 7.0-3 (Austrian Engineering)

  • Price: ₹70,000-77,000
  • Efficiency: 98.1% (peak) | Weighted: 97.9%
  • Key Features:
    • Integrated Wi-Fi/Ethernet monitoring
    • Dynamic peak manager for grid stability
    • IP65 outdoor rating
    • 5-year warranty (extendable to 20 years)
  • Best For: Premium installations wanting maximum efficiency

SMA Sunny Tripower 7000TL (German Quality)

  • Price: ₹66,500-73,500
  • Efficiency: 98.4% (max) | Weighted: 98.1%
  • Key Features:
    • OptiCool active cooling for hot climates
    • Integrated DC surge protection
    • 5-year warranty (extendable to 25 years)
  • Best For: Performance-focused setups

Mid-Range (Value Leaders)

Delta Solivia RPI M7A

  • Price: ₹52,500-59,500
  • Efficiency: 97.6% (weighted)
  • Key Features:
    • Wide MPPT voltage range
    • Fanless natural cooling (reliable in dusty areas)
    • 5-year warranty
  • Best For: Reliable performance at competitive pricing

Growatt MAC 7KTL3-X

  • Price: ₹49,000-56,000
  • Efficiency: 97.4% (weighted)
  • Key Features:
    • Dual MPPT for different roof orientations
    • Smart diagnostics
    • WiFi monitoring included
  • Best For: Multi-orientation arrays

Solis 7K-5G

  • Price: ₹47,600-52,500
  • Efficiency: 97.3% (weighted)
  • Key Features:
    • Dual MPPT with 99.9% tracking efficiency
    • Wide operating temp (-25°C to 60°C)
    • Natural convection cooling
  • Best For: Budget-conscious quality seekers

Indian Premium Options

Luminous Solar NXI 7kW

  • Price: ₹59,500-66,500
  • Efficiency: 97.5% (weighted)
  • Key Features:
    • Largest Indian solar inverter brand
    • 20+ service centers in Telangana
    • Integrated WiFi monitoring
    • 5-year warranty with easy claims
  • Best For: Local support and peace of mind

Tata Power Solar Inverter 7kW

  • Price: ₹63,000-70,000
  • Efficiency: 97.3% (weighted)
  • Key Features:
    • Tata brand reliability
    • Multiple Hyderabad service locations
    • CEA grid-code compliant
  • Best For: Brand-conscious buyers

Selection Criteria for Hyderabad

  1. Efficiency Above 97%: Even 1% efficiency loss means losing 350+ units annually on a 7kW system.
  2. Operating Temperature Range: Choose inverters rated to 60°C+ for Hyderabad’s 50-60°C ambient summer conditions.
  3. Dual MPPT: Essential if panels span East-West roofs or multiple roof sections.
  4. Grid Compliance: CEA 2019 compliance ensures smooth TSSPDCL/TSNPDCL approval.
  5. Service Network: International brands have authorized centers; Indian brands offer faster response.

[Compare All Inverter Brands]

[Insert Image: Inverter installation showing proper ventilation in Hyderabad climate]


Verified Solar Installers in Hyderabad

Selecting an experienced, reliable installer is as crucial as component quality. Here’s how to connect with verified solar EPCs:

How to Get Competitive Quotes

Rather than listing installers that may become outdated, we recommend:

[Get 3 Free Quotes from Verified Installers] ← Access our installer network

Our platform connects you with:

  • MNRE-empanelled installers registered on PM Surya Ghar portal
  • TSSPDCL/TSNPDCL-approved vendors for seamless net metering
  • Minimum 50+ Hyderabad projects completed
  • 4.5+ star ratings from verified customers
  • Comprehensive warranties: 25-year panel, 5-10 year inverter, 5-year workmanship

What to Evaluate in Installers

1. DISCOM Experience

  • Track record with TSSPDCL/TSNPDCL net metering?
  • Complete documentation support?

2. Component Quality

  • ALMM-listed, MNRE-approved components?
  • Multiple brand options or single-brand push?

3. Workmanship Warranty

  • Standard is 5 years for installation quality
  • Who handles claims—installer or manufacturer?

4. Post-Installation Support

  • Annual maintenance contracts available?
  • Response time for issues?

5. Subsidy Assistance

  • Complete subsidy documentation support?
  • Success rate with subsidy disbursement?

6. Payment Terms

  • Typical: 30% advance, 40% at installation, 30% post-commissioning
  • Avoid 100% advance demands

Typical Project Timeline in Hyderabad

  • Site Survey: 1-2 days
  • Proposal & Approval: 3-5 days
  • Net Metering Application: Submit to TSSPDCL/TSNPDCL with ₹2,500 fee
  • Feasibility Approval: 7-10 days
  • Installation: 1-2 days for 7kW system
  • Testing & Inspection: 1 day
  • DISCOM Commissioning: 7-15 days
  • Subsidy Disbursement: 30-60 days post-commissioning

Total Timeline: 4-7 weeks from contract to operational system

[Get Quotes from Verified Installers in Your Area]

[Insert Image: Professional installation team on Hyderabad rooftop with safety equipment]


ROI Calculator: Your Actual Savings in Hyderabad

Let’s calculate real numbers based on typical Hyderabad consumption and TSSPDCL/TSNPDCL tariffs.

Sample Scenario: 3BHK Flat in Kukatpally

Current Monthly Bill: ₹6,500 Current Monthly Consumption: 850 units TSSPDCL Tariff Bracket: ₹7.50-9.10/unit (weighted average ₹7.65/unit)

7kW Solar System Performance:

  • Daily Generation: 29 units (conservative, 5.2 peak sun hours)
  • Monthly Generation: 870 units
  • System Covers: 100% of consumption + 20 units surplus

Financial Analysis

Year 1 Savings:

  • Units Consumed from Solar: 850 units × ₹7.65 = ₹6,502/month
  • Annual Bill Savings: ₹78,024
  • Surplus Exported: 20 units × ₹3.50 (feed-in) = ₹70/month = ₹840/year
  • Total Year 1 Benefit: ₹78,864

System Cost After Subsidy: ₹4,10,000 (average)

Payback Period: 5.2 years

25-Year Lifetime Savings:

  • Years 1-10: ₹7,88,640 (assuming 5% annual tariff increase)
  • Years 11-25: ₹16,34,720 (considering 0.5%/year degradation)
  • Total Lifetime Savings: ₹24,23,360
  • Minus System Cost: -₹4,10,000
  • Net Profit: ₹20,13,360

Interactive Calculator

[Embedded ROI Calculator]

Your Details:

  • Current Monthly Bill: [₹______]
  • System Size: [7kW] (auto-filled)
  • Location: [Hyderabad] (auto-filled)
  • DISCOM: [Select: TSSPDCL / TSNPDCL]

[Calculate My Exact Savings]

Real Tariff Impact (TSSPDCL/TSNPDCL 2025)

Hyderabad’s slab-based tariffs:

  • 0-50 units: ₹1.90/unit
  • 51-100 units: ₹3.00/unit
  • 101-200 units: ₹4.80/unit
  • 201-300 units: ₹6.60/unit
  • 301-400 units: ₹7.75/unit
  • 401-800 units: ₹9.10/unit
  • Above 800 units: ₹10.00/unit

Critical Insight: If you’re consuming 700-900 units monthly, you’re in the ₹9.10/unit bracket. Solar costs effectively ₹4-5 per unit over 25 years—a 50% reduction even without factoring tariff hikes.

[Insert Infographic: ROI curve showing breakeven point and cumulative savings over 25 years]

[Add Data Source: TSSPDCL Tariff Order 2024-25]


Net Metering in Hyderabad: Complete Process Guide

Net metering transforms your 7kW system into a financial powerhouse by allowing surplus export and credit accumulation.

Hyderabad’s Two DISCOMs

TSSPDCL (Telangana Southern Power Distribution Company Limited)

  • Covers: Hyderabad, Rangareddy, Medchal-Malkajgiri, Vikarabad, Sangareddy (partial)
  • Website: www.tssouthernpower.com
  • Net Metering Fee: ₹2,500

TSNPDCL (Telangana Northern Power Distribution Company Limited)

  • Covers: Other Telangana districts
  • Website: www.tsnpdcl.in
  • Net Metering Fee: ₹2,500

Net Metering Regulations (TGERC 2025)

Under TGERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulation 2025:

Capacity Limits:

  • Minimum: 1 kWp
  • Maximum (Residential): 500 kWp
  • Your 7kW System: Well within limits ✓

Key Benefits:

  • Gross Metering: Bi-directional meter tracks import/export separately
  • Settlement Period: Annual (April-March)
  • Export Credit Rate: Typically 50-60% of retail tariff per TGERC
  • No Wheeling Charges: For systems up to sanctioned load
  • No Cross-Subsidy: Residential exempted

Step-by-Step Net Metering Application

Step 1: Online Registration

  • Visit TSSPDCL/TSNPDCL website
  • Download Application Form (Annexure-I)

Step 2: Document Preparation

  • Latest electricity bill
  • DD for ₹2,500 (DISCOM name)
  • Two self-addressed ₹5 stamped envelopes
  • Property ownership proof
  • Aadhar card copy

Step 3: Submission

  • Submit at Consumer Service Center
  • Or upload via DISCOM portal
  • Receive registration number

Step 4: Feasibility Study

  • DISCOM site assessment (7-10 days)
  • Transformer capacity check
  • Feasibility approval issued

Step 5: Installation

  • Proceed after feasibility clearance
  • CEA 2019 Grid Code compliance mandatory
  • Installer submits work completion

Step 6: Inspection & Commissioning

  • DISCOM technical inspection
  • Grid synchronization testing
  • Bi-directional meter installation

Step 7: Agreement Execution

  • ₹200 Non-Judicial Stamp Paper
  • Agreement format from DISCOM website
  • Valid for system lifespan

Step 8: System Activation

  • Commissioning certificate issued
  • System goes live
  • Monthly billing shows net consumption

Important Requirements for 7kW Systems

Safety Equipment:

  • MCB, isolation switch, lightning arrestor
  • Anti-islanding protection in inverter
  • IS/IEC standards compliance

Typical Costs:

  • Application Fee: ₹2,500
  • Bi-directional Meter: ₹8,000-12,000 (some installers include)
  • Stamp Paper: ₹200

[Download: TSSPDCL Net Metering Application Form] [Download: TSNPDCL Net Metering Guidelines]

[Insert Image: Bi-directional meter showing import/export readings]


Hyderabad’s Solar Advantage: Climate & Generation Data

Why Hyderabad ranks among India’s top solar cities:

Solar Irradiance Profile

Average Daily Irradiance: 5.5 kWh/m²/day (annual average)

Monthly Breakdown:

  • January-February: 5.0-5.2 kWh/m²/day
  • March-May (Summer): 6.0-6.5 kWh/m²/day (Peak!)
  • June-August (Monsoon): 4.5-5.0 kWh/m²/day
  • September-October: 5.5-5.8 kWh/m²/day
  • November-December: 5.2-5.5 kWh/m²/day

Sunny Days: 280-300 annually

Temperature Considerations

Summer (March-June):

  • Ambient: 38-42°C
  • Rooftop Module Temp: 60-70°C
  • Impact: -10 to -15% from STC ratings
  • Mitigation: N-Type panels with superior temp coefficients

Monsoon (July-September):

  • Humidity: 70-80%
  • Cloudy days: 20-25 per season
  • Impact: 15-20% generation reduction
  • Mitigation: Panels with good diffused-light performance

Winter (December-February):

  • Optimal temperatures for peak efficiency
  • Clear skies, low humidity
  • Best performance months

Real 7kW System Output in Hyderabad

Conservative Calculation:

  • System Size: 7 kW
  • Peak Sun Hours: 5.2 hours (annual average)
  • System Losses: 20% (soiling, cables, inverter, temperature)
  • Daily Generation: 7 kW × 5.2 hours × 0.80 = 29.1 units/day

Optimistic Calculation (Premium components, regular cleaning):

  • System Losses: 15%
  • Daily Generation: 7 kW × 5.5 hours × 0.85 = 32.7 units/day

Monthly Variation:

  • Best Month (April-May): 35-38 units/day = 1,050-1,140 units/month
  • Worst Month (July-August): 22-26 units/day = 660-780 units/month
  • Average: 870-980 units/month

Soiling & Maintenance in Hyderabad

Dust Accumulation Patterns:

  • Summer: Heavy dust from construction, traffic
  • Monsoon: Rain provides natural cleaning
  • Post-Monsoon: Dust settles quickly

Recommended Cleaning Schedule:

  • Summer (March-May): Every 20-25 days
  • Monsoon (June-September): Natural rain cleaning sufficient
  • Post-Monsoon (October-November): Every 30 days
  • Winter (December-February): Every 45-60 days

Cleaning Impact:

  • Dirty panels: -15 to -25% output loss
  • Clean panels: Full rated performance
  • Annual professional cleaning cost: ₹1,500-2,500

[Add Data Source: India Meteorological Department, Hyderabad Solar Data]

[Insert Chart: Month-by-month generation curve for 7kW system in Hyderabad]


Frequently Asked Questions: 7kW On-Grid Solar System Hyderabad

Can a 7kW system power my entire 3BHK flat in Hyderabad?

Absolutely. A 7kW system generating 28-32 units daily can comfortably power:

  • 1-2 split ACs running 8-10 hours
  • 1 refrigerator, 1 washing machine
  • 8-10 LED lights, 4-5 fans
  • Water motor, geyser, microwave, TV, laptop

If your current monthly consumption is 700-900 units, a 7kW system will cover 90-100% of your needs. For homes consuming 900-1,100 units, expect 75-85% offset—still dramatically reducing bills.

The key is aligning high-consumption activities with solar hours (9 AM – 5 PM). With net metering, daytime surplus credits your account for evening use.

How much roof space do I need for a 7kW On-Grid solar system?

You’ll need 550-700 square feet of shadow-free rooftop area:

  • High-wattage panels (540-550W): ~550 sq ft for 13 panels
  • Mid-wattage panels (450-500W): ~630 sq ft for 14-15 panels
  • Standard panels (330-400W): ~700 sq ft for 18-21 panels

Critical: Area must be shadow-free between 9 AM-3 PM year-round. Even 10-15% shading can reduce output by 20-30%.

Most Hyderabad 3BHK flats with 1,000-1,200 sq ft total terrace area can easily accommodate 7kW after accounting for water tanks, lift rooms, and walkways.

Roof Orientation:

  • South-facing: Ideal (100% efficiency)
  • East/West-facing: 90-95% efficiency (acceptable)
  • North-facing: 70-75% efficiency (avoid if possible)

Will my 7kW on-grid system work during power cuts?

No, standard on-grid systems automatically shut down during grid outages for safety—mandatory under grid-tie regulations. When TSSPDCL/TSNPDCL power fails, your system stops to prevent dangerous back-feeding.

If you need backup power:

Option 1: Hybrid Solar System

  • Add battery storage (3-7 kWh typical)
  • Works as on-grid normally
  • Switches to battery during outages
  • Additional cost: ₹1,05,000-2,45,000
  • [Explore 7kW Hybrid Systems]

Option 2: Separate Inverter Battery

  • Keep on-grid system
  • Install independent home UPS + battery
  • Less efficient but lower cost

For most Hyderabad homes where grid reliability exceeds 95%, pure on-grid offers best economics. Invest savings in quality components rather than batteries.

What maintenance costs should I expect?

7kW systems are remarkably low-maintenance:

Year 1-5:

  • Panel cleaning: ₹1,750-2,450/year (6-8 sessions)
  • Annual system check: ₹1,050-1,400
  • Total Annual: ₹2,800-3,850

Year 6-10:

  • Same cleaning schedule
  • Inverter warranty covers failures
  • Possible connector tightening: ₹700-1,050 (one-time)
  • Total Annual: ₹2,800-4,200

Year 11-15:

  • Inverter replacement: ₹49,000-70,000 (one-time, year 10-12)
  • Panel cleaning continues

Year 16-25:

  • Panels still at 80-85% capacity
  • Second inverter replacement (year 20-22)

Lifetime Maintenance Budget: ₹1,40,000-1,75,000 over 25 years Average Annual: ₹5,600-7,000

Compare to ₹78,000/year in electricity savings—maintenance is just 7-9% of savings.

How long for subsidy disbursement after installation?

Based on PM Surya Ghar implementation in Hyderabad:

Timeline:

  1. Installation completion: Day 0
  2. Submit application with commissioning certificate: Day 1-3
  3. DISCOM verification (TSSPDCL/TSNPDCL): 7-15 days
  4. MNRE approval & processing: 15-30 days
  5. Direct Benefit Transfer to bank: 30-60 days total

Current Reality (December 2025):

  • Fast-track cases: 30-45 days
  • Average cases: 45-75 days
  • Delayed cases (doc issues): 90-120 days

Tips for Faster Subsidy:

  • Ensure MNRE-empanelled installer
  • All components ALMM-listed
  • Keep original bills, invoices, photos
  • BIS-certified inverter mandatory
  • Accurate application (rejections delay 30+ days)

The ₹78,000 subsidy is directly credited to your bank—not to installer. Most installers require full payment upfront; you claim subsidy separately.

Is my rooftop strong enough for a 7kW solar system?

A 7kW system with mounting weighs approximately 420-525 kg total—about 60-75 kg per 100 sq ft.

For Hyderabad Buildings:

RCC Roofs (Most Common):

  • Load capacity: 200-300 kg/sq meter
  • 7kW system load: 60-75 kg/sq meter
  • Verdict: Absolutely safe ✓

Asbestos/Metal Sheet Roofs:

  • Requires lightweight mounting
  • Feasible with structural support
  • Engineer assessment recommended

Old Buildings (20+ years):

  • Structural assessment suggested (₹2,100-3,500)
  • Most pass easily
  • If reinforcement needed: ₹10,500-17,500

Wind Load: Quality mounting handles:

  • Wind speed: 150 km/h (well above Hyderabad’s typical 60-80 km/h)
  • Uplift resistance: 2,400 Pa
  • Anchoring: Expansion bolts into RCC

Installer should provide IS 875 compliance certificate.

Can I expand later if I buy an electric vehicle?

Yes, with considerations:

Net Metering Limit: Your agreement allows capacity up to sanctioned load. If sanctioned load is 4 kW and you have 7 kW solar (1.75x multiplier, allowed under TGERC), expansion requires:

  1. Load enhancement application to TSSPDCL/TSNPDCL
  2. Pay load enhancement charges
  3. Modify net metering agreement (₹350-700 fee)

EV Charging Requirements:

  • Typical EV (Nexon EV): 30 kWh battery
  • Daily charging (40 km driving): 4-5 kWh
  • Your 7kW system generating 29 units can easily handle this

Better Approach: Optimize charging timing:

  • Charge during solar hours (10 AM – 3 PM)
  • 7kW system can charge EV + run home loads simultaneously
  • Surplus goes to EV instead of export

For most single-EV households, 7kW is sufficient. Expand to 10kW only if:

  • 2+ EVs planned
  • Daily driving exceeds 80 km combined
  • Want faster charging

[Internal Link: 10kW Solar System Hyderabad]

What happens to excess electricity I generate?

Under TSSPDCL/TSNPDCL net metering:

Monthly Settlement:

  • Bi-directional meter tracks import/export separately
  • Monthly bill: Units Consumed – Units Exported = Net Units
  • Pay only for net units

Example Month:

  • Solar generated: 900 units
  • Home consumed: 850 units
  • Surplus exported: 50 units
  • Grid imported (nights): 100 units
  • Net consumption: 100 – 50 = 50 units
  • Bill: ~₹380 (50 units + fixed charges)

Annual Reconciliation (April-March):

  • Annual surplus credits purchased by DISCOM
  • Rate: ₹3.00-4.50/unit (vs. ₹7-10 you save)
  • Credits expire at year end

Maximize Value: Self-consume during solar hours:

  • Run washing machine, dishwasher midday
  • Charge devices during peak sun
  • Pre-cool home with AC before evening
  • Heat water during solar hours

Target: 85-90% self-consumption for optimal ROI.

Are there tax benefits or additional incentives?

Central Government:

  • PM Surya Ghar Subsidy: ₹78,000
  • Income Tax Deduction: Section 80EEB expired March 2024
  • GST Exemption: 5% GST applicable (reduced from 12%)

State (Telangana):

  • No Electricity Duty: On solar self-consumption
  • Net Metering: Free (no wheeling/banking charges)
  • Additional State Subsidy: Not currently available for residential

Indirect Benefits:

  • Property Value: Solar homes command 3-5% premium
  • Faster Resale: Energy-efficient homes sell 15-20% faster
  • Insurance: Some insurers offer 2-5% home insurance discount

For Commercial Properties:

  • Accelerated depreciation: 40%
  • GST Input Credit: Claimable

Consult CA for specific tax situation.


Making Your Decision: Is 7kW Right for You?

A 7kW on-grid solar system is ideal if:

✓ Your monthly consumption is 700-1,000 units ✓ Your monthly bill is ₹5,000-8,000 ✓ You have 550-700 sq ft shadow-free rooftop ✓ You plan to stay 5+ years (for full ROI) ✓ You want energy independence and locked electricity costs for 25 years ✓ You’re a 3BHK household with 1-2 ACs

Consider a Smaller System (5kW) If:

  • Monthly consumption: 500-700 units
  • Limited rooftop: 400-550 sq ft
  • Tighter budget: ₹2.8-3.5 lakh after subsidy
  • [Internal Link: 5kW Solar System Hyderabad]

Consider a Larger System (10kW) If:

  • Monthly consumption: 1,000-1,500 units
  • Large villa or 4BHK home
  • Multiple ACs or high-power appliances
  • [Internal Link: 10kW Solar System Hyderabad]

Consider Hybrid Instead If:

  • Frequent power cuts
  • Critical backup needs (medical equipment, home office)
  • Budget for extra ₹1-2.5 lakh for batteries
  • [Internal Link: 7kW Hybrid Solar System Hyderabad]

Next Steps: Your Solar Journey Starts Here

Installing a 7kW solar system is a transformative investment. Here’s your action plan:

Step 1: Verify Your Roof

  • Measure shadow-free area (9 AM – 3 PM)
  • Check orientation (South/East/West preferred)
  • Note obstructions (tanks, lift rooms, trees)

Step 2: Analyze Consumption

  • Gather 12 months’ electricity bills
  • Calculate average monthly units
  • Identify peak months

Step 3: Get Multiple Quotes

  • Minimum 3 quotes from different installers
  • Compare brands, warranties, workmanship
  • Verify MNRE empanelment

Step 4: Verify Subsidy Eligibility

  • Confirm installer PM Surya Ghar registration
  • All components ALMM-listed
  • Understand disbursement timeline

Step 5: Plan Financing

  • Solar loans: 9-12% interest typical
  • Compare loan vs. self-funding ROI

Step 6: Understand Net Metering

  • Know your DISCOM (TSSPDCL/TSNPDCL)
  • Installer handles complete process
  • Keep documents ready

Step 7: Schedule Installation

  • Best timing: October-February (less rain, moderate temps)
  • Plan for 1-2 day installation
  • Ensure household access

Get Your Free Customized Quote

Stop paying ₹5,000-8,000 monthly to TSSPDCL/TSNPDCL when you could produce your own clean electricity for 25 years.

A 7kW on-grid solar system isn’t just eco-friendly—it’s the smartest financial move for your home, delivering 400-500% returns over its lifetime.

[Get 3 Free Quotes from Verified Hyderabad Solar Installers]

Our platform connects you with:

  • ✓ MNRE-empanelled, DISCOM-approved installers
  • ✓ Detailed site assessment and shading analysis
  • ✓ Multiple component options (budget to premium)
  • ✓ Complete net metering and subsidy support
  • ✓ Comprehensive warranties and maintenance
  • ✓ Transparent, competitive pricing

No obligation. No spam. Just honest quotes.

Questions? Need Help?

  • Call: [Contact Number]
  • Email: [Support Email]
  • WhatsApp: [WhatsApp Link]

Recommended Schema Markup

Implement these schema types for maximum search visibility:

1. FAQ Schema

All 8 FAQs with complete Q&A for rich results.

2. Product Schema

  • Product: 7kW On-Grid Solar System
  • Price Range: ₹3,62,000 – ₹4,62,000
  • Availability: In Stock
  • Location: Hyderabad, Telangana

3. HowTo Schema

“How to Apply for PM Surya Ghar Subsidy” with step-by-step instructions.

4. Local Business Schema

When adding preferred installers with ratings, contact, service area.

5. Breadcrumb Schema

Home > Solar Systems > 7kW Systems > 7kW On-Grid Hyderabad


Related Solar Solutions in Hyderabad

Other System Sizes:

  • [5kW On-Grid Solar System Hyderabad] – Smaller homes (500-700 units/month)
  • [10kW On-Grid Solar System Hyderabad] – Large homes (1000-1500 units/month)
  • [15kW On-Grid Solar System Hyderabad] – Villas, multi-family (1500+ units/month)

System Types:

  • [7kW Hybrid Solar System Hyderabad] – On-grid + Battery backup
  • [7kW Off-Grid Solar System Hyderabad] – Complete independence

Components:

  • [Best Solar Panels India 2025] – Detailed brand comparison
  • [Solar Inverter Buying Guide] – String vs. Micro vs. Hybrid
  • [Solar Subsidy Calculator] – Location-specific estimates

Other Cities:

  • [7kW Solar System Bangalore] – Karnataka vs. Telangana comparison
  • [7kW Solar System Mumbai] – Maharashtra policies
  • [7kW Solar System Delhi] – North India climate

Resources:

  • [PM Surya Ghar Complete Guide] – Subsidy scheme details
  • [Net Metering State Guide] – DISCOM processes
  • [Solar ROI Calculator] – Financial modeling

Ready to cut your electricity bills by 70-85% and lock in energy costs for 25 years?

[Get 3 Free Quotes from Verified Installers Now]


Last Updated: January 2025 | Sources: MNRE, TSSPDCL, TSNPDCL, PM Surya Ghar Portal, IMD

Scroll to Top