Step-By-Step Solar Installation Process in India (2025): The Complete Guide to Costs, Requirements & Mistakes to Avoid
When my neighbor installed solar panels last year, I watched the entire process unfold from my terrace. What seemed like a simple weekend project turned into a two-week journey involving multiple teams, paperwork mountains, and several unexpected costs. That experience taught me something crucial: installing solar isn’t just about slapping panels on your roof.
If you’re reading this, you’re probably tired of rising electricity bills and curious about how solar can help. Maybe you’ve heard about government subsidies and want to know if they’re real. Or perhaps you’ve received confusing quotes from installers and don’t know what to believe.
Here’s what I’m going to walk you through today: the complete step-by-step solar installation process in India, from the first roof inspection to your final net metering approval. You’ll learn exactly what happens during installation, how much it actually costs (including those hidden charges installers don’t mention), which components matter most, and the critical mistakes that could cost you thousands. By the end, you’ll know more about solar installation than most homeowners do after they’ve already installed their system.
Let’s dive in.
Step 1 — Pre-Installation Assessment & Planning (Site, Load, and Feasibility)
Before spending a single rupee, you need to understand whether solar makes sense for your home. I’ve seen too many people rush into installation only to discover their roof wasn’t suitable or their system was completely oversized.
How to Check Your Roof Suitability (Space, Shade & Orientation)
Your roof is where the magic happens, so let’s start there.
Space requirements: A 1kW solar system needs approximately 100 square feet of shadow-free roof area. So for a 3kW system, you’re looking at around 300 square feet, and a 5kW system needs about 500 square feet. Measure your available roof space first.
Orientation matters hugely: South-facing roofs are ideal in India because they receive maximum sunlight throughout the day. East and west-facing roofs work too, but expect 10-15% lower generation. North-facing roofs? I’d generally avoid them unless you have no other option.
The shadow problem: This is where most homeowners get it wrong. Walk onto your roof at different times—8 AM, 12 PM, and 4 PM. Notice any shadows from nearby buildings, trees, or water tanks? Even partial shading on one panel can reduce your entire system’s output by 20-30%. If you have a water tank casting shadows, consider relocating it before installation.
Roof condition: Check for leaks, cracks, or weak spots. Solar panels last 25+ years, and you don’t want to remove them after five years to fix your roof. Get any repairs done before installation.
[Visual suggestion: Infographic showing ideal vs problematic roof conditions with shadow patterns]
How to Calculate Your Daily Electricity Load Accurately
Here’s a method that actually works. Pull out your last 6-12 months of electricity bills and note your monthly consumption in units (kWh). Add them up and divide by the number of months to get your average monthly consumption.
For example, if you consumed 3,600 units over 12 months, your average is 300 units per month, or roughly 10 units per day.
But here’s the trick: don’t just look at averages. Check your peak summer months (April-June) because that’s when your AC runs full blast and consumption spikes. Design your system for peak consumption, not average.
Quick appliance audit: List your major consumers:
- Air conditioner (1.5 ton): 1.5-2 units per hour
- Refrigerator: 2-3 units per day
- Washing machine: 1-2 units per cycle
- Water heater: 2-4 units per use
- LED lights: Negligible
This helps you understand where your power goes and whether you can reduce consumption before installing solar.
[Source link needed: MNRE guidelines for load calculation – https://mnre.gov.in]
Selecting the Right System Size: 3kW vs 5kW vs 10kW
This decision determines everything else—cost, roof space, subsidy eligibility, even your payback period.
3kW system: Generates 12-15 units per day (varies by location and season). Perfect for homes consuming 300-400 units monthly. Cost: ₹1.8-2.1 lakhs after subsidy. This is the sweet spot for most Indian households.
5kW system: Produces 20-25 units daily. Suitable for larger homes or those with higher consumption (500-700 units/month). Cost: ₹2.5-3 lakhs after subsidy. Good if you’re planning to add an EV or increase appliance usage.
10kW system: Commercial-scale for very large homes or small businesses. Generates 40-50 units daily. Cost: ₹4.5-5.5 lakhs after subsidy (residential subsidy caps at 3kW or 10kW depending on state).
Pro tip: If you’re on the fence between sizes, I’d lean toward the larger system. Solar panel prices have dropped significantly, but installation labor costs haven’t. The incremental cost of adding 1-2kW now is much less than installing another system later.
[Chart suggestion: Comparison table of 3kW/5kW/10kW systems showing daily generation, cost, space needed, and suitable consumption]
Tools & Methods for Basic Shadow Analysis Before Installation
You don’t need expensive equipment for this. Here’s what I recommend:
The sun path method: Stand on your roof at solar noon (around 12:30 PM in most of India) and observe shadow patterns. Mark the shadowed areas with chalk. Repeat at 9 AM and 3 PM to see how shadows move.
Google Earth trick: Open Google Earth Pro (free desktop version), enter your address, and use the sunlight feature to simulate shadows at different times of year. This works surprisingly well.
Solar pathfinder apps: Apps like Sun Surveyor (iOS/Android) use your phone’s camera and GPS to show the sun’s path throughout the year. Point it at your roof to identify problematic periods.
Professional option: Most reputable installers provide free shadow analysis using tools like PV syst or Helioscope during site visits. This should be standard practice.
Critical insight: Winter shadows are longer than summer shadows. What looks fine in May might be heavily shaded in December. Plan for the worst case.
[External link: Sun Surveyor app or similar solar pathfinder tool]
Homeowner Solar Installation Checklist India (What You Must Prepare)
Before installers arrive, have these ready:
Documents:
- Last 12 months electricity bills (for load assessment and DISCOM approval)
- Property ownership proof (sale deed, property tax receipt)
- Electricity connection details (consumer number, sanctioned load)
- ID proof (Aadhaar, PAN)
- Bank account details (for subsidy disbursement)
Physical preparation:
- Clear roof access (remove stored items, ensure safe ladder access)
- Designate an indoor space for inverter installation (cool, dry, ventilated)
- Arrange electrical board access for AC connection
- Inform security/society if applicable
Technical preparation:
- Confirm your DISCOM allows net metering (most do, but verify)
- Check if your electrical wiring can handle solar input (15+ year old wiring might need upgrades)
- Photograph your roof and surroundings (useful for quote comparisons)
[Downloadable checklist suggestion: Create a PDF checklist readers can print]
[Internal link opportunity: Link to your detailed state-wise net metering guide]
Step 2 — Choosing the Right Solar Components (Panels, Inverter, Structure & Wiring)
The quality of components determines whether your system runs smoothly for 25 years or gives you headaches every monsoon. Let me break down what actually matters.
Which Solar Panels Are Best for Indian Rooftops? (Mono, Bifacial, TOPCon)
Walking through the solar panel market feels like navigating a maze. Let me simplify it.
Monocrystalline (Mono PERC): These are the standard choice for residential installations in India right now. They’re efficient (18-22%), perform decently in high temperatures, and cost-effective. Brands like Adani, Waaree, Vikram Solar offer reliable options. Expect to pay ₹18-24 per watt.
Bifacial panels: These capture sunlight from both sides—the front and reflected light from your roof surface. They offer 5-10% more generation than standard panels but cost 15-20% more. Worth it if you have a light-colored or reflective roof (white tiles, metal sheets). Not worth the premium for dark asphalt roofs.
TOPCon (Tunnel Oxide Passivated Contact): The newest technology with 22-24% efficiency and better performance in hot weather (crucial for India). They’re 10-15% more expensive than standard Mono PERC but offer better long-term returns. If your budget allows, go for TOPCon from tier-1 manufacturers.
Temperature coefficient matters: Indian summers mean rooftop temperatures can hit 65-70°C. Look for panels with low temperature coefficients (around -0.35%/°C or better). This determines how much efficiency you lose in heat.
Brand reliability: Stick to Tier-1 Indian manufacturers (Waaree, Adani, Vikram, Renewsys) or international brands (Jinko, Longi, Canadian Solar). Yes, there are cheaper options from unknown brands, but the 25-year warranty is only as good as the company backing it.
[Data point needed: Current market share of different panel types in India – source: Bridge to India or MNRE reports]
[External link: BIS standards for solar panels – https://bis.gov.in]
Selecting the Right Inverter Type (String, Micro, Hybrid)
The inverter is your system’s brain, converting DC power from panels into usable AC power for your home.
String inverters: One central inverter for all panels. Most common for residential installations. Cost-effective (₹8,000-15,000 per kW), easy to maintain, and suitable when your roof has no shading issues. Brands: Sungrow, Growatt, Delta, Fronius.
Drawback: If one panel underperforms (due to shade or defect), it affects the entire string’s output.
Microinverters: One tiny inverter per panel. Each panel operates independently, so shading on one doesn’t impact others. Perfect for complex roofs with multiple orientations or partial shading. Cost: ₹12,000-18,000 per kW.
Downside: Higher upfront cost and more components that could potentially fail (though Enphase and APSystems have excellent reliability).
Hybrid inverters: These can work with batteries, allowing you to store excess solar power. Essential if you’re planning to add batteries later or face frequent power cuts. Cost: ₹15,000-25,000 per kW for good brands (Luminous, Growatt, Deye).
My recommendation: For most Indian homes with good sunlight and minimal shading, a quality string inverter is perfect. Go hybrid if you plan to add batteries within 2-3 years. Choose microinverters only if you have serious shading challenges.
Sizing matters: Your inverter capacity should typically be 80-90% of your panel capacity. For a 5kW panel system, a 4-4.5kW inverter is ideal. This accounts for the fact that panels rarely operate at full capacity and saves you money on inverter costs.
[Chart suggestion: Side-by-side comparison of inverter types with pros/cons/ideal use cases]
Understanding Mounting Structures & Their Role in Efficiency
This might seem boring, but the mounting structure determines your panel angle, durability against wind, and even generation efficiency.
Material matters: Galvanized iron (GI) is standard and rust-resistant for 20+ years if properly coated. Aluminum is lighter and rust-proof but more expensive. Avoid mild steel unless it’s hot-dip galvanized.
Fixed tilt vs. adjustable: Most residential installations use fixed-tilt structures set at your latitude angle (for Bangalore it’s 13°, Delhi 28°, Mumbai 19°). Adjustable structures let you change angles seasonally for 5-10% more generation but cost significantly more and require maintenance.
Tilt angle optimization: The general rule is setting the tilt angle equal to your latitude. But in India, 15-20° works well across most locations because higher angles collect more sunlight during the winter months when generation typically drops.
Wind load calculation: India has different wind zones (Basic Wind Speed zones as per IS 875). Coastal areas need structures designed for higher wind loads. Your installer should calculate this—don’t skip it or you risk panels flying off during cyclones.
Roof penetration: For RCC roofs, structures are anchored with chemical anchors or expansion bolts. Insist on waterproofing at penetration points (most installers use silicon sealant). For metal roofs, clamps work without drilling holes.
[Visual suggestion: Diagram showing proper mounting structure installation with waterproofing details]
Wiring, Protection Devices & Safety Components Explained
This is where fire safety and system longevity are determined. Cheap wiring is the biggest false economy in solar.
DC cables: Must be UV-resistant, weather-proof solar DC cables (not regular electrical cables). Size depends on current, but typically 4mm² or 6mm² for residential systems. Use only tinned copper cables from reputed brands (Polycab, KEI, RR Kabel).
AC cables: From inverter to your main distribution board. Size based on your system capacity and distance. Typically 4mm² for 3kW systems, 6mm² for 5kW.
DC isolators (Circuit Breakers): Essential safety switch that lets you disconnect panels from the inverter for maintenance. Should be rated for DC voltage (unlike regular MCBs which are AC-rated).
AC isolator/MCB: Protects the AC side between inverter and main board. Rated for your system’s AC output current.
Surge Protection Device (SPD): Protects against lightning strikes and voltage surges. Absolutely essential in areas prone to thunderstorms. Type 2 SPD is standard for residential systems.
Earthing: Your entire system must be properly earthed—panel structure, inverter body, and cable armor. Earth resistance should be below 5 ohms (2 ohms is ideal). This isn’t optional; it’s life-saving.
Fire safety: Insist on a DC isolator near the panels (rooftop level) and one near the inverter. In case of fire, you can cut power from panels immediately.
[Safety note: According to MNRE guidelines, all solar installations must comply with CEA (Central Electricity Authority) safety regulations]
[External link: CEA safety regulations for rooftop solar]
Sample Solar Wiring Diagram for On-Grid Rooftop Systems (India-specific)
Let me walk you through a typical on-grid system wiring:
Flow:
- Solar panels (connected in series to form strings) → DC cables → Rooftop DC isolator
- DC isolator → Conduit/tray down to inverter location → Inverter DC input
- Inverter converts DC to AC → AC isolator/MCB
- AC MCB → Your main distribution board → AC loads in your home
- Excess power flows through → Your existing electricity meter (net meter)
- Net meter → DISCOM grid
Key components in the diagram:
- Array junction box (if you have multiple strings)
- SPD on both DC and AC sides
- Independent earthing electrode
- Generation meter (monitors your solar production)
- Bidirectional net meter (records import and export)
Cables run:
- DC cables must be rated for 1.5x your maximum system voltage
- Use cable trays or conduits (not exposed wiring)
- Maintain polarity (mark positive and negative clearly)
- Keep DC cables as short as possible to minimize losses
Common wiring mistakes:
- Undersized cables causing voltage drop
- Mixing DC and AC isolators (they’re different!)
- Poor terminations leading to arcing
- No provision for expansion (adding panels later)
[Visual must-have: Detailed wiring diagram showing all components with proper labels and cable specifications]
[Internal link opportunity: Link to your detailed on-grid vs off-grid system comparison]
Step 3 — Finding the Right Installer or EPC Company
This decision matters more than the panel brand you choose. A great installer can make average components perform excellently, while a poor installer will ruin even the best equipment.
EPC vs Local Installer — Which One Is Better for Homeowners?
Let’s demystify this difference.
EPC (Engineering, Procurement, Construction) Companies: These are larger firms that handle everything—design, components procurement, installation, and often post-sales service. Examples: Tata Power Solar, Jakson, Servotech, Goldi Solar.
Advantages:
- Complete accountability (one throat to choke)
- Better project management and timelines
- Usually use better-quality, certified components
- Professional designs and documentation
- Strong warranty support
Disadvantages:
- Higher costs (15-20% more than local installers)
- Less flexibility in component choices
- Slower response times for small service issues
- Sales-heavy approach (you might get oversold)
Local Installers: Smaller firms or individual contractors operating in your city. They might be MNRE-registered or empaneled with your state nodal agency.
Advantages:
- Lower costs (competitive pricing)
- More personalized service
- Faster response for repairs and maintenance
- Flexibility in component selection
- Local presence means easier accountability
Disadvantages:
- Quality varies dramatically (harder to assess reliability)
- Might use cheaper components to win bids
- Limited technical expertise in complex scenarios
- Warranty enforcement can be challenging
- Business continuity risk (they might shut down)
My honest recommendation: For systems under 5kW where cost is a primary concern, go with a reputable local installer who’s been in business for 5+ years and has verifiable installations in your area. For larger systems (10kW+) or if you want absolute peace of mind, choose an EPC despite the higher cost.
[Data point: According to Bridge to India reports, approximately 60-70% of residential solar in India is installed by local contractors rather than large EPCs]
How to Evaluate Solar Quotes (With Sample PDF Included)
I’ve reviewed hundreds of solar quotes, and most homeowners have no idea what to look for. Here’s your evaluation framework.
What a proper quote must include:
- System specifications:
- Exact panel brand, model, and wattage
- Inverter brand, model, and capacity
- Structure material and design
- Cable specifications
- Protection devices (MCBs, isolators, SPD)
- Itemized pricing:
- Component costs (panels, inverter, structure separately)
- Installation labor
- Civil/electrical work charges
- DISCOM charges for net metering
- Transportation and logistics
- Taxes (GST)
- Performance projections:
- Expected annual generation (in units/kWh)
- Generation warranty (typically 90% in year 1, degrading to 80% by year 25)
- Assumptions used (solar irradiation, performance ratio, losses)
- Warranties:
- Panel warranty (25 years performance, 10-12 years product)
- Inverter warranty (5-10 years)
- Workmanship warranty (1-5 years)
- Structure warranty (10+ years)
- Post-installation services:
- Net metering application handling
- Subsidy application and documentation
- Annual maintenance contracts
- Monitoring system provision
Quote comparison checklist:
When comparing quotes, create a spreadsheet with these columns:
- Company name
- Total system cost
- Price per watt (total cost ÷ system size)
- Panel brand and efficiency
- Inverter brand
- Warranty coverage
- Estimated annual generation
- Subsidy handling included?
- Payment terms
The lowest quote isn’t always the best. A quote that’s 20-30% lower than others is a red flag—they’re either using inferior components or will hit you with “extras” later.
Payment terms matter: Standard practice is 30-40% advance, 50-60% before installation, and final 10% after commissioning. Never pay more than 50% upfront.
[Downloadable resource: Sample solar installation quotation PDF with annotations explaining each section]
[External link: MNRE’s list of approved brands and models]
Red Flags and Common Scams to Avoid When Choosing Installers
I’ve seen people lose lakhs to scam artists. Watch for these warning signs:
Red flag #1: “We’re running a limited-time offer, decide today” Pressure tactics are the oldest sales trick. Any legitimate installer will give you time to decide. Take at least a week to evaluate quotes.
Red flag #2: Vague quotes without brand names If the quote says “Premium monocrystalline panels” without specifying the brand and model, run. This lets them install the cheapest garbage later.
Red flag #3: “We’ll handle the subsidy, just sign here” Subsidy scams are rampant. The installer asks you to sign blank subsidy forms, applies for subsidy in your name, and pockets it while claiming it was rejected. Always track your subsidy application yourself on the PM Surya Ghar portal.
Red flag #4: No physical office or only a mobile number Visit their office before signing. If they only operate via WhatsApp or have a “virtual office,” you’ll never find them when things go wrong.
Red flag #5: Unusually low prices If everyone quotes ₹55,000 per kW and one quote comes at ₹35,000 per kW, something’s wrong. They’re either planning to use substandard materials or will abandon the project halfway.
Red flag #6: No clear warranty documentation Verbal promises mean nothing. Get warranty cards for panels and inverter, plus a written workmanship warranty from the installer.
Red flag #7: Pushing for immediate cash payments Professional installers accept bank transfers and provide proper invoices. Cash-only operators are avoiding taxes and likely won’t be around for warranty claims.
Verification steps:
- Check MNRE empanelment status
- Ask for references and physically visit 2-3 completed installations
- Search for reviews on Google, Facebook groups, and solar forums
- Verify their GST registration
- Check how long they’ve been in business (avoid companies less than 2 years old)
[Case study suggestion: Brief story of a scam victim and how they could have avoided it]
Certifications, Experience & Warranty Checks You Must Perform
Installer certifications:
MNRE empanelment: Technically not mandatory for residential installations, but it indicates the installer meets basic quality criteria. Check the MNRE website for empaneled vendors.
State Nodal Agency registration: Many states require installers to register with the state nodal agency to handle subsidies. Verify this.
ISO certifications: ISO 9001 (quality management) is good to have for larger companies. Not essential for smaller installers but shows professionalism.
Technical certifications: Better installers have staff trained by NSDC (National Skill Development Corporation) or NISE (National Institute of Solar Energy).
Experience verification:
Ask specific questions:
- How many residential installations have you completed? (Look for 50+ for credibility)
- What’s your largest residential installation? (Tests their capacity)
- Do you have installations in my specific area? (Climate/DISCOM experience matters)
- Can I visit 3 sites installed at least 2 years ago? (Long-term performance proof)
- Who handles your post-installation service? (In-house team vs. outsourced)
Warranty documentation:
Get everything in writing before signing:
- Component warranty cards (original, not photocopies)
- Comprehensive workmanship warranty (covers leaks, wiring, structure defects)
- Service response time commitments (within 24/48 hours)
- Annual maintenance inclusions
- Performance guarantee (minimum generation assurance)
[Checklist suggestion: Installer verification checklist that readers can use during meetings]
How to Shortlist the Best Solar Installation Companies Near You
Step-by-step shortlisting process:
- Create a long list (8-10 companies):
- Google search: “solar installation companies in [your city]”
- Ask in local community groups
- Check MNRE empaneled vendor list filtered by state
- Look at online directories (Solar Mango, GEM portal)
- Initial screening (narrow to 4-5):
- Visit websites, check professionalism
- Call and ask basic questions, gauge responsiveness
- Eliminate those without physical offices
- Remove companies in business less than 3 years
- Request detailed quotes (from 3-4 finalists):
- Provide identical specifications to all
- Request itemized quotes with brands specified
- Ask for sample project documents
- Check if they’ll visit your site (should be free)
- Site visits and meetings:
- Schedule on-site assessments
- Evaluate their technical team’s knowledge
- Discuss roof-specific challenges
- Ask about past installations with similar constraints
- Reference checks:
- Visit 2-3 installations by each finalist
- Talk to those homeowners directly (installers can coach references, so ask tough questions)
- Check completion timelines and post-sales responsiveness
- Look for workmanship quality (cable management, structure finishing)
- Final decision criteria:
- Quality of components (30% weight)
- Total cost (25% weight)
- Warranty terms (20% weight)
- Company stability and reputation (15% weight)
- Post-sales service quality (10% weight)
[Internal link: Link to your city-wise guide of top solar installers]
Step 4 — Understanding the Solar Installation Cost Structure in India
Let’s talk money. Solar installation costs have dropped dramatically over the past decade, but there’s still massive confusion about what you actually pay.
3kW, 5kW, 10kW Rooftop Solar Cost Breakdown (2025 Updated)
Current market rates (before subsidy):
3kW system:
- Total cost: ₹1,65,000 – ₹2,10,000
- Per watt cost: ₹55-70
- Components:
- Panels (540W × 6): ₹54,000-72,000
- Inverter (3kW): ₹24,000-36,000
- Mounting structure: ₹18,000-24,000
- Cables and protection: ₹12,000-18,000
- Installation labor: ₹21,000-30,000
- Net metering charges: ₹8,000-12,000
- Misc (earthing, transportation): ₹8,000-12,000
5kW system:
- Total cost: ₹2,75,000 – ₹3,25,000
- Per watt cost: ₹55-65
- Components:
- Panels (540W × 10): ₹90,000-1,20,000
- Inverter (5kW): ₹35,000-50,000
- Mounting structure: ₹30,000-40,000
- Cables and protection: ₹18,000-25,000
- Installation labor: ₹30,000-40,000
- Net metering charges: ₹10,000-15,000
- Misc: ₹12,000-18,000
10kW system:
- Total cost: ₹5,00,000 – ₹6,00,000
- Per watt cost: ₹50-60
- Components:
- Panels (540W × 19): ₹1,80,000-2,30,000
- Inverter (10kW): ₹60,000-85,000
- Mounting structure: ₹55,000-70,000
- Cables and protection: ₹30,000-40,000
- Installation labor: ₹50,000-70,000
- Net metering charges: ₹12,000-18,000
- Misc: ₹20,000-30,000
Cost trends: Notice how per-watt cost decreases with system size. This is due to fixed costs (inverter, labor, net metering) being spread over more panels. That’s why slightly oversizing your system often makes financial sense.
[Chart suggestion: Visual breakdown of cost components as a pie chart for each system size]
[Data source needed: MNRE Benchmark Costs 2024-25 for rooftop solar]
State-Wise Solar Prices After Subsidy (Karnataka, Telangana, Maharashtra, TN, etc.)
The PM Surya Ghar Yojana (launched in 2024) provides central subsidies for residential solar:
- 1kW systems: ₹30,000
- 2kW systems: ₹60,000
- 3kW and above: ₹78,000
Some states offer additional subsidies on top of central subsidy. Let me break this down:
Karnataka:
- 3kW system cost: ₹1,80,000 (average)
- Central subsidy: ₹78,000
- State top-up: ₹0 (discontinued as of 2024)
- Final cost: ₹1,02,000
- DISCOM: BESCOM, MESCOM, GESCOM (net metering well established)
Telangana:
- 3kW system cost: ₹1,75,000
- Central subsidy: ₹78,000
- State top-up: ₹0
- Final cost: ₹97,000
- DISCOM: TSSPDCL, TSNPDCL (good net metering support)
Maharashtra:
- 3kW system cost: ₹1,85,000
- Central subsidy: ₹78,000
- State top-up: ₹0 (earlier schemes now closed)
- Final cost: ₹1,07,000
- DISCOM: MSEDCL, BEST, Adani Electricity, Tata Power (varies by area)
Tamil Nadu:
- 3kW system cost: ₹1,70,000
- Central subsidy: ₹78,000
- State top-up: ₹0
- Final cost: ₹92,000
- DISCOM: TANGEDCO (excellent solar support, but subsidy processing can be slow)
Gujarat:
- 3kW system cost: ₹1,75,000
- Central subsidy: ₹78,000
- State top-up: ₹0
- Final cost: ₹97,000
- DISCOM: DGVCL, MGVCL, PGVCL, UGVCL (very solar-friendly state)
Delhi:
- 3kW system cost: ₹1,90,000
- Central subsidy: ₹78,000
- State top-up: Limited to specific schemes
- Final cost: ₹1,12,000
- DISCOM: BSES Yamuna, BSES Rajdhani, TPDDL (excellent net metering infrastructure)
Rajasthan:
- 3kW system cost: ₹1,65,000
- Central subsidy: ₹78,000
- State top-up: ₹0
- Final cost: ₹87,000
- DISCOM: Jaipur, Jodhpur, Ajmer DISCOMs (good solar penetration)
Important notes:
- Costs are approximate averages; actual quotes vary by city, installer, and components
- State subsidies keep changing; check the latest on your state nodal agency website
- Urban areas typically cost 10-15% more than rural areas due to access and labor costs
[Data table: Comprehensive state-wise comparison with current subsidy status]
[External links: State nodal agency websites for each major state]
Subsidy Eligibility for Homeowners: PM Surya Ghar + State Top-Ups
Not everyone qualifies for subsidies. Here’s what you need to know.
PM Surya Ghar Yojana Eligibility:
Who qualifies:
- Individual homeowners (residential consumers)
- Grid-connected systems only (off-grid not eligible)
- System size: 1kW to 10kW (subsidy capped at 3kW capacity)
- One-time subsidy per household
- Must be registered electricity consumer
Who doesn’t qualify:
- Rented properties (unless landlord applies)
- Commercial establishments
- Group housing societies (different scheme applies)
- Those who’ve already received central solar subsidy previously
Application process:
- Register on the National Portal for Rooftop Solar: https://solarrooftop.gov.in
- Apply for subsidy before installation (post-installation applications often rejected)
- Get feasibility approval from DISCOM
- Install through MNRE-empaneled vendor (mandatory for subsidy)
- Apply for net metering
- Submit commissioning report
- DISCOM inspection
- Subsidy disbursed directly to your bank account (timeframe: 30-90 days post-commissioning)
Common rejection reasons:
- Installing before applying for subsidy
- Using non-empaneled installers
- Incomplete documentation
- Property ownership disputes
- Already received subsidy under previous schemes
- System size mismatch with application
**State top-up schemes**
-up schemes:**
These vary dramatically and change frequently. As of 2025:
- Kerala: Additional ₹15,000/kW (check KSEB portal)
- Himachal Pradesh: Interest subsidy on loans
- Uttarakhand: Additional subsidy under state scheme (check UREDA)
Most states have discontinued additional subsidies beyond the central scheme, so always verify the current status.
[Step-by-step visual: Flowchart showing the subsidy application process]
[External link: PM Surya Ghar portal with direct registration link]
Hidden Costs Installers Don’t Tell You (Cabling, Structure, Civil Work)
This is where quotes get ugly. Here are costs that often appear as “extras” mid-project:
1. Upgraded electrical panel: If your main distribution board is old or undersized, you might need to upgrade it to handle solar input. Cost: ₹5,000-15,000.
2. Meter box relocation: Sometimes your existing meter position isn’t suitable for net meter installation. DISCOM may require relocation. Cost: ₹3,000-8,000.
3. Extended cable runs: Quotes typically assume the inverter is within 10-15 feet of your main board. Longer distances mean more cable. Cost: ₹150-250 per meter of AC cable.
4. Roof waterproofing repairs: If your roof needs waterproofing before or after mounting structure installation. Cost: ₹50-100 per sq ft.
5. Shade-free access path: Creating passage for cable runs might require civil work (chiseling walls, creating conduits). Cost: ₹5,000-20,000 depending on complexity.
6. Extra earthing: If your existing earthing is poor (resistance >5 ohms), you’ll need additional earthing. Cost: ₹2,000-5,000 per pit.
7. DISCOM inspection charges: Some DISCOMs charge for site inspection before net metering approval. Cost: ₹500-3,000 (state-dependent).
8. Structure customization: Non-standard roof angles, uneven surfaces, or Mangalore tile roofs need custom structures. Additional cost: ₹3,000-10,000.
9. Lightning arrester: Not always included in quotes but essential in high-lightning-risk areas. Cost: ₹2,000-5,000.
10. Monitoring system: Basic monitoring is included, but advanced IoT-based systems with detailed analytics cost extra. Cost: ₹5,000-15,000.
Protection strategy:
- Ask explicitly about these items during quotation
- Get a written “not-to-exceed” total price
- Demand that all possible extras be listed upfront
- Include a clause that any extra work needs written approval with cost justification
[Internal link: Link to your “Understanding Solar Contracts” guide]
Factors That Influence Final Installation Cost (Brand, Roof Type, Labour)
Let’s break down why two identical-sized systems can have vastly different prices.
Component brand:
- Tier-1 panels (Jinko, Longi, Canadian Solar): ₹22-26/watt
- Tier-1 Indian panels (Waaree, Adani): ₹18-24/watt
- Tier-2/3 panels (unknown brands): ₹14-18/watt
Quality difference is real—tier-1 panels maintain 90%+ efficiency in year 10, while cheap panels might drop to 75-80%.
Inverter brand:
- Premium (Fronius, SMA): ₹12-15,000/kW
- Mid-range (Sungrow, Growatt, Delta): ₹8-11,000/kW
- Budget (unbranded): ₹5-7,000/kW
Inverter is the most failure-prone component. Saving ₹10,000 here could cost you ₹50,000 in replacements within 5 years.
Roof type impact:
- RCC flat roof: Standard cost (baseline)
- Sloped tile roof: +10-15% (needs custom mounting, careful tile handling)
- Metal sheet roof: -5-10% (easier, faster installation using clamps)
- Asbestos roof: +15-20% (delicate, needs load analysis, special mounting)
- Terrace with tiles: +5-10% (need tile removal/replacement)
Installation complexity:
- Single-story with easy roof access: Baseline
- Multi-story (>2 floors): +10-15% (equipment hauling, safety gear)
- Gated community restrictions: +5-10% (timing constraints, access hassles)
- Difficult terrain access: +10-20% (narrow lanes, no vehicle access)
Labor cost geography:
- Metro cities (Mumbai, Delhi, Bangalore): ₹10-12/watt
- Tier-2 cities: ₹8-10/watt
- Rural areas: ₹6-8/watt
System size economies:
- 1-2kW: ₹65-75/watt (poor economies of scale)
- 3-5kW: ₹55-65/watt (optimal residential size)
- 7-10kW: ₹50-60/watt (best value per watt)
Seasonal pricing: Peak season (February-April, September-October): Installers are busy, less room for negotiation. Off-season (June-August monsoon): Better discounts possible, but installation delays due to weather.
[Calculator suggestion: Interactive cost calculator where readers can input their parameters]
Step 5 — The Actual Solar Installation Process (Day-Wise Timeline)
Now we get to the exciting part—watching your system come to life. Here’s exactly what happens during those crucial days.
What Happens on Installation Day 1 (Structure Fixing & Wiring Prep)
Morning (8 AM – 12 PM):
The installation team arrives with a truck loaded with mounting structures, panels, and tools. First 30 minutes are spent unloading and transporting materials to the rooftop. They’ll also check:
- Roof access is clear
- Inverter location is finalized
- Main distribution board location is accessible
- You’ve made space for temporary storage
Structure installation begins:
The team marks drill points on the roof according to the design layout. For a 3kW system (6 panels), you’re looking at roughly 12-18 mounting points depending on structure design.
Drilling process:
- Hammer drills create holes (typically 12mm diameter, 75-100mm deep for RCC roofs)
- Chemical anchors or expansion bolts are inserted
- Torque-controlled tightening ensures proper holding strength
- Each anchor point is tested for pull-out strength
Critical observation: Watch for waterproofing at drill points. They should apply silicon sealant or rubber gaskets at every penetration. No exceptions. This prevents monsoon leaks.
Structure assembly: The team assembles the aluminum/GI rails horizontally, attaching them to the anchor points. They check:
- Levelness (using spirit level)
- Proper tilt angle (should match the design—typically 15-20°)
- Wind load stability (structure shouldn’t wobble)
- Spacing for panel placement
DC cable conduit preparation:
While some team members work on structure, others prepare the cable route from the rooftop to inverter location:
- Installing cable trays or PVC conduits
- Drilling through walls if necessary (waterproofing these holes too)
- Creating a clean, protected path for DC cables
Afternoon (1 PM – 5 PM):
Earthing pit work: If new earthing is needed, they dig a pit (typically 6 feet deep), insert copper/GI earth electrode, add charcoal and salt mixture for better conductivity, and connect earthing strips.
Inverter mounting preparation: The wall where inverter will mount is prepared—drilling anchor holes, checking wall strength (inverter weighs 8-15 kg typically), ensuring the location is cool, dry, and has ventilation.
End of Day 1 status:
- Mounting structure completely installed
- Cable conduits laid
- Earthing completed
- Inverter mounting board prepared
- Panels and inverter still in boxes (installation starts Day 2)
What you should verify:
- All roof penetrations are waterproofed
- Structure is firmly fixed (try shaking it—should be rock solid)
- They’ve cleaned up debris (metal shavings, concrete dust)
- No tiles broken or damaged
[Photo suggestion: Step-by-step images of structure installation process]
Panel Mounting, Inverter Setup & AC/DC Cable Routing Explained
Day 2 Morning (8 AM – 12 PM):
Panel installation:
This is the most delicate part. Each 540W panel weighs about 27kg, and one drop can destroy it.
The team carefully unpacks panels and carries them to the rooftop. They:
- Place panels on the rails (aligned to mounting slots)
- Secure using mid-clamps and end-clamps with appropriate torque
- Maintain 10-15mm gap between panels for thermal expansion
- Connect panels in series using MC4 connectors
Series connection explained: For a 3kW system with six 540W panels:
- Panels 1-6 are connected in series (positive to negative)
- This creates one string with approximately 240-260V DC output
- For larger systems, multiple strings might be created and connected in parallel at a junction box
Cable routing from panels: DC cables run from the last panel down through the conduit to ground level. Proper cable management means:
- Using cable ties every 30cm
- Avoiding sharp bends (minimum 10cm radius)
- Keeping positive and negative cables together
- Labeling cables clearly
Inverter installation:
The inverter is mounted on the wall at the prepared location:
- Minimum 0.5 meters from ceiling (for heat dissipation)
- Minimum 0.3 meters from any wall or corner
- At eye level for easy monitoring (typically 5-6 feet high)
- Secured with mounting brackets (inverter should not move even if pushed)
DC connection to inverter: The rooftop DC cables are connected to inverter DC input terminals. Polarity is critical—positive to positive, negative to negative. Reversal can damage the inverter instantly.
A DC isolator is installed either near the inverter or on the rooftop (better practice is both locations for maximum safety).
Afternoon (1 PM – 5 PM):
AC side wiring:
AC cables run from inverter output to your main distribution board. This involves:
- Installing a dedicated MCB in your board for solar input (typically 16A for 3kW, 25A for 5kW)
- Running appropriately sized AC cables (4mm² for 3kW, 6mm² for 5kW)
- Installing AC isolator between inverter and board
- Proper terminations at both ends (using ferrules for safety)
Surge Protection Device installation: SPD is installed on both DC side (near inverter DC input) and AC side (at the distribution board). This protects your system from lightning strikes and grid voltage surges.
Earthing connections:
Everything metal gets grounded:
- Panel mounting structure (connected to earth electrode via GI strip)
- Inverter body (dedicated earth terminal)
- Cable armor/conduit (if metallic)
Earth continuity is tested using a megger to ensure resistance is below 5 ohms.
End of Day 2 status:
- All panels mounted and interconnected
- Inverter installed and wired
- AC and DC connections completed
- System ready for testing
- But not yet powered on (safety protocols)
[Video suggestion: Time-lapse of the full installation process]
[Internal link: Link to your troubleshooting guide for common installation issues]
Safety Testing, Earthing & Commissioning Procedures
Day 3 (Final Day):
Before flipping the switch, rigorous testing ensures your system is safe and will perform correctly.
Insulation resistance testing: Using a megger, technicians test:
- DC cable insulation: Should show >1 MΩ (mega ohm)
- AC cable insulation: Should show >1 MΩ
- Panel-to-ground insulation: Should show >10 MΩ
Low readings indicate cable damage or moisture ingress—must be fixed before commissioning.
Polarity check: Multimeter confirms:
- All DC connections have correct polarity
- AC phasing is correct
- No reverse connections anywhere
Open circuit voltage (Voc) test: With panels exposed to sunlight but not yet connected to inverter:
- Measure voltage at DC isolator terminals
- Should match datasheet specifications (typically 240-260V DC for 6 panels in series)
- Significant deviation indicates panel damage or poor connections
String current test: After connecting to inverter:
- Measure current from each string
- All strings should show similar current (within 10% of each other)
- Unequal currents indicate shading or defective panel
Grid connection check: Before connecting to the grid:
- Verify grid voltage is within acceptable range (typically 200-250V AC in India)
- Check grid frequency (should be 50Hz ±5%)
- Inverter won’t start if grid parameters are outside safe limits
First power-on:
This is the moment of truth. With everyone watching:
- Close DC isolator (connecting panels to inverter)
- Turn on inverter power switch
- Inverter performs self-diagnostics (takes 30-60 seconds)
- If all parameters are OK, inverter starts generating
- Watch the display show power output (usually starts at a few watts and ramps up)
Performance verification: With the system running:
- Measure AC voltage at inverter output (should be 230V ±10V)
- Check power output against expected value (based on time of day and weather)
- Verify inverter display shows correct data (voltage, current, power, generation)
- Confirm your home is using solar power (lights should not dim or flicker)
Monitoring system setup: Most modern inverters have Wi-Fi dongles or monitoring devices:
- Connect to your home Wi-Fi
- Install manufacturer’s app on your phone
- Register the system
- Verify data is being logged (generation stats, alerts)
Final documentation: Before the team leaves, get:
- Commissioning certificate (signed by installer)
- Component warranty cards (original)
- System schematic diagram
- User manual for inverter
- Emergency shutdown procedure
- Service contact numbers
Inspection checklist: Walk around and verify:
- All cables are properly secured (no loose hanging wires)
- Inverter is displaying generation
- Main distribution board MCB is labeled
- Roof is clean (installation debris removed)
- All isolators are accessible and labeled
- You know how to shut down the system in emergency
[Checklist download: Post-installation inspection checklist for homeowners]
[External link: CEA safety standards for solar commissioning]
Typical Installation Time for 3kW & 5kW Rooftop Systems
Let’s talk realistic timelines.
3kW system:
- Day 1: Structure and preparation (6-8 hours)
- Day 2: Panel mounting and wiring (6-8 hours)
- Day 3: Testing and commissioning (3-4 hours)
- Total: 2.5-3 days for a standard RCC rooftop with no complications
5kW system:
- Day 1-2: Structure (larger area, more anchor points) (10-12 hours)
- Day 3: Panel mounting (10 panels vs 6) (6-8 hours)
- Day 4: Wiring and commissioning (6-7 hours)
- Total: 3-4 days
Factors that extend timeline:
- Complex roof access: Add 0.5-1 day
- Sloped tile roof: Add 1 day (careful tile handling)
- Multiple roof orientations: Add 0.5 day
- Extensive civil work needed: Add 1-2 days
- Weather delays: Monsoon can cause 3-5 day delays
- Approval delays: Waiting for DISCOM permissions (not installation time, but adds to overall timeline)
Total project timeline (from order to generation):
- Site survey: 3-7 days after inquiry
- Quote approval: You take 5-10 days
- DISCOM feasibility approval: 7-15 days
- Material procurement: 3-7 days
- Installation: 2-4 days
- Testing and commissioning: 1 day
- Net metering application: 7-30 days (varies dramatically by DISCOM)
- DISCOM inspection and meter installation: 7-15 days
Total: 35-80 days from inquiry to fully operational net-metered system
States like Gujarat and Karnataka are faster (35-45 days typical). States like Maharashtra and Bihar can take 60-90 days due to bureaucratic delays.
[Timeline visualization: Gantt chart showing the full project timeline with buffer periods]
Installation Mistakes to Avoid (Common Errors by Technicians)
Even experienced installers make these mistakes. Watch for them:
Mistake #1: Insufficient waterproofing at penetrations The #1 cause of post-installation complaints. Monsoons will reveal every poorly sealed hole. Insist on MS sealant (not cheap silicon) at every roof penetration.
Mistake #2: Incorrect tilt angle I’ve seen installers set panels flat on horizontal roofs “because it’s easier.” This reduces generation by 15-20% and causes water pooling. Always maintain minimum 10° tilt even on flat roofs.
Mistake #3: Undersized cables Using 2.5mm² cables instead of 4mm² to save ₹1,000 causes voltage drops and heat buildup—fire risk over time. Verify cable sizes match specifications.
Mistake #4: Poor cable management Loose cables flapping in the wind get damaged within months. All cables must be secured every 30cm with UV-resistant cable ties or clips.
Mistake #5: Mixed panel orientations without optimization Installing half panels facing east and half facing west sounds smart for all-day generation. But connecting them in the same string causes massive losses. Each orientation needs separate strings or microinverters.
Mistake #6: Inverter in direct sunlight or enclosed space Inverters hate heat. Installing in direct sun or a closed electrical room reduces lifespan significantly. Insist on a cool, ventilated, shaded location.
Mistake #7: Inadequate earthing The “we’ll just connect to your existing earth” approach is dangerous. Solar systems need dedicated, low-resistance earthing. Test it—don’t trust verbal assurances.
Mistake #8: No DC isolator on rooftop Having only one DC isolator at ground level is unsafe. In case of fire, you can’t cut power at the source. Insist on a rooftop DC isolator.
Mistake #9: Skipping insulation testing Many installers skip megger testing to save time. This is how you get electrical faults later. Don’t let them skip this step.
Mistake #10: Not documenting “as-built” layout Your system might need repairs in 5 years when the original installer is gone. Without a clear layout diagram, troubleshooting becomes nightmare. Get a detailed as-built drawing.
Your protection: Be present during installation. Take photos at each stage. Ask questions. Don’t sign the completion certificate until you’ve verified everything on your checklist.
[Infographic: Visual guide showing correct vs incorrect installation practices]
Step 6 — Net Metering, Approvals & Post-Installation Checklist
The installation is done, panels are generating, but you’re not truly operational until net metering is approved. This is where many homeowners face frustrating delays.
How Net Metering Works in India (Simple Billing Explanation)
Let me explain this with a real example because most explanations online are confusing.
What is net metering?
Net metering is a billing arrangement where your electricity meter runs backward when your solar system exports excess power to the grid. You get credit for this exported power, which offsets your consumption during night or cloudy days.
How it works in practice:
Imagine your situation on a sunny day:
- 10 AM-4 PM: Your 3kW system generates 18 units, but your home only uses 8 units. Excess 10 units flow to the grid.
- 4 PM-10 AM (next morning): Your panels generate 0 units (night), but your home consumes 12 units from the grid.
Old meter scenario (without net metering): You’d pay for all 12 units consumed at night at regular rates, and get nothing for the 10 units you exported. Total loss.
With net metering (bidirectional meter): The meter tracks both import (12 units) and export (10 units). Your bill is calculated as: Net consumption = Import – Export = 12 – 10 = 2 units
You only pay for 2 units. The 10 units you exported “paid for” 10 of your 12 night-time units.
Billing cycle settlement:
Most states use monthly settlement:
- At month-end, if export > import, the excess is carried forward as credit to next month
- If import > export, you pay for the net units consumed
- Unused credits typically expire after 12 months (varies by state)
Gross vs Net Metering:
- Net metering (most common): Single bidirectional meter tracks net flow. Explained above.
- Gross metering (rare now): Two meters—one for generation (paid at FiT rate), one for consumption (paid at retail rate). Generally less favorable for homeowners.
Rate structures:
Your solar exports are typically valued at your retail tariff (what you normally pay per unit). However, some states have different rules:
- Karnataka: Net metering at retail tariff for systems up to sanctioned load
- Maharashtra: Net metering at ₹3-4/unit (lower than retail) in some areas
- Tamil Nadu: Net metering at retail rates
- Delhi: Net metering with annual settlement
Always check your state’s specific net metering policy on the DISCOM website.
[Diagram suggestion: Flowchart showing power flow during day vs night with meter readings]
[External link: State-wise net metering policies on MNRE portal]
Documents Required for Net Metering Approval (State-Wise)
Net metering applications require substantial paperwork. Here’s what you need:
Universal documents (required in all states):
- Net metering application form (DISCOM-specific format, download from their website)
- Copy of electricity bill (latest, showing consumer number)
- Identity proof (Aadhaar card, PAN card, Voter ID)
- Address proof (matching installation address)
- Property ownership proof (sale deed, property tax receipt, or No Objection Certificate from owner if rented)
- Single line diagram (SLD) of the solar system showing all components
- Technical specifications of panels, inverter, and other components
- Test certificates (insulation test, earthing test, inverter test)
- Installation certificate from installer (on company letterhead)
- Photographs of installed system (panels, inverter, metering area)
State-specific additional documents:
Karnataka (BESCOM/MESCOM/GESCOM):
- Electrical contractor license copy
- Building plan approval (if available)
- Society NOC (for apartments)
- Chartered Engineer certificate for systems >10kW
Maharashtra (MSEDCL):
- Electrical supervisor license
- Occupancy certificate (for new buildings)
- Fire NOC (for systems >10kW)
- MSEDCL-specific technical forms
Tamil Nadu (TANGEDCO):
- Electrical supervisor permit
- Building plan approval
- Life Certificate (if senior citizen benefits claimed)
Delhi (BSES/TPDDL):
- Technical feasibility certificate from DISCOM (obtained first)
- Electrical contractor registration
- BIS standards compliance certificate
Gujarat (DGVCL/MGVCL/etc.):
- CEI (Chief Electrical Inspector) approval for >10kW systems
- Electrical supervisor certificate
- GEDA empanelment certificate (if claiming subsidy)
Submission process: Most DISCOMs now accept online applications through their portal. Physical submission may still be required for supporting documents. Check your DISCOM website for the exact process.
[Document checklist: Downloadable PDF with state-wise requirements]
[Internal link: Link to your DISCOM-wise detailed guides]
DISCOM Inspection & Final Commissioning Process
After you submit your net metering application, here’s what happens:
Stage 1: Application screening (3-7 days) DISCOM reviews your application and documents. Common rejection reasons:
- Incomplete forms
- Missing technical certificates
- System size exceeds sanctioned load
- Installation not compliant with state regulations
If rejected, you’ll need to resubmit with corrections.
Stage 2: Feasibility approval (7-15 days) DISCOM verifies that your area’s grid can handle bidirectional power flow. In well-developed areas, this is automatic. In rural or old infrastructure areas, they might impose conditions or even reject (rare).
Stage 3: Site inspection scheduling (7-15 days) Once approved, DISCOM schedules an inspection. This is where delays happen—some DISCOMs are quick (3-5 days in Gujarat), others take weeks (Maharashtra, UP can take 30+ days).
Stage 4: Physical inspection A DISCOM technical team visits your home and checks:
- System installation quality
- Safety compliance (earthing, isolators, MCBs)
- Metering arrangement
- Single line diagram matches actual installation
- Inverter settings (anti-islanding protection, voltage/frequency limits)
- No unauthorized connections or bypasses
What inspectors look for:
- Anti-islanding: Inverter must shut down within 5 seconds if grid fails (safety requirement)
- Voltage and frequency limits: Inverter settings must comply with CEA regulations
- Earthing resistance: Must be <5 ohms
- Meter installation point: Must be accessible for reading and in proper enclosure
Common reasons for inspection failure:
- Insufficient earthing
- Inverter settings not compliant
- Poor workmanship (exposed wires, improper cable routing)
- Meter box not suitable for bidirectional meter
- Safety isolators missing or inaccessible
If you fail inspection, you’ll need to rectify issues and request re-inspection (this can add 2-4 weeks to the timeline).
Stage 5: Net meter installation (3-7 days after passing inspection) DISCOM replaces your existing meter with a bidirectional (net) meter. This is usually free or involves a nominal charge (₹500-3,000 depending on state).
The new meter has two displays:
- Import (units consumed from grid)
- Export (units sent to grid)
Stage 6: Final commissioning & agreement You sign the net metering agreement with DISCOM. This formalizes the arrangement and specifies:
- System capacity
- Settlement period (monthly/annual)
- Tariff rates
- Maintenance responsibilities
- Disconnection clauses
You’re now officially net-metered! Your bills will reflect net consumption from the next billing cycle.
Total timeline from application to net meter:
- Fast states (Gujarat, Karnataka): 20-30 days
- Average states (Delhi, Tamil Nadu): 30-45 days
- Slow states (Maharashtra, UP, Bihar): 45-90 days
[Process flowchart: Visual representation of the entire approval process]
[External link: CEA regulations on technical standards for grid connectivity]
Post-Installation Safety & Performance Checks
Don’t just set and forget. Perform these checks regularly:
Monthly checks (5 minutes):
- Verify inverter display shows generation (during daytime)
- Check for any error codes or warnings
- Look for physical damage (cracked panels, loose cables)
- Ensure inverter ventilation is not blocked
- Check that monitoring app is updating data
Quarterly checks (15 minutes):
- Clean panels if dusty (hosing with water usually sufficient)
- Inspect cable ties and connections (tighten if loose)
- Check for bird nesting or debris accumulation
- Verify earthing strip connections are intact
- Test DC and AC isolators (switch off and on to ensure they work)
Annual checks (professional service recommended):
- Thermal imaging of panels (identifies hotspots indicating cell damage)
- Insulation resistance testing with megger
- Torque check on all electrical connections
- Inverter filter cleaning (if applicable)
- Update inverter firmware if available
- Detailed performance analysis (compare actual vs expected generation)
Performance benchmarking:
Track your system’s performance ratio (PR): PR = (Actual generation) / (Expected generation based on solar irradiation)
A healthy system should maintain PR above 80%. If yours drops below 75%, investigate:
- Panel soiling (clean them)
- Shading (new construction nearby? Tree growth?)
- Inverter issues (check error logs)
- Component failure (panel or connection problem)
Safety red flags:
- Burning smell near inverter or cables
- Inverter frequently shutting down
- Sparking or arcing sounds
- Physical damage to cables or panels
- Inverter running hot (>65°C surface temperature)
- Tripping of MCBs
If you notice any of these, shut down the system immediately (DC isolator off, AC MCB off) and call your installer.
[Maintenance schedule: Downloadable annual maintenance calendar]
Monitoring Your Solar Generation (App, IoT Metering, Analytics)
Modern solar systems give you incredible visibility into performance. Here’s how to make the most of it:
Inverter built-in monitoring:
Most inverters have:
- LED indicators (green = normal, red = fault)
- LCD display showing real-time power, daily/total generation
- Wi-Fi dongle or built-in connectivity for remote monitoring
Brands and their monitoring platforms:
- Sungrow: iSolarCloud app
- Growatt: ShinePhone app
- Delta: M/S Monitor app
- Fronius: Solar.web
- Huawei: FusionSolar
These apps typically show:
- Current power generation
- Daily, monthly, yearly generation
- Lifetime generation and CO₂ saved
- Alerts and error messages
- Weather-adjusted performance
- Financial savings
Advanced monitoring systems:
For data enthusiasts, third-party IoT energy monitors provide deeper insights:
Sense: Real-time device-level energy monitoring. Identifies which appliances are using power and how much solar is offsetting.
Solar Analytics: Paid service that provides performance benchmarking, fault detection, and maintenance alerts. Particularly useful for identifying underperformance early.
Enphase Enlighten: If you have Enphase microinverters, their monitoring is excellent—panel-level data showing if even a single panel underperforms.
Key metrics to track:
- Specific yield: kWh generated per kW installed per day. For India:
- Excellent: >4.5 units/kW/day
- Good: 3.5-4.5 units/kW/day
- Poor: <3.5 units/kW/day (investigate issues)
- Performance Ratio: Should be >80% for well-maintained systems.
- Seasonal variation: Expect 30-40% lower generation in monsoon vs summer. Anything more suggests issues.
- Financial savings: Monthly savings = (Units generated × Your tariff) – Monthly system cost
Setting up alerts:
Configure your monitoring app to alert you for:
- Zero generation on sunny days (inverter or grid issue)
- Generation 20%+ below expected
- Inverter errors or shutdowns
- Grid disconnection
[Screenshot examples: Sample monitoring app screenshots with annotations explaining each metric]
[Internal link: Link to your guide on maximizing solar generation]
FAQ Section
What is the typical solar installation cost for a 3kW rooftop system in India?
A 3kW rooftop solar system costs between ₹1,65,000-₹2,10,000 before subsidy. After the central government subsidy of ₹78,000 under PM Surya Ghar Yojana, your net cost comes down to ₹87,000-₹1,32,000. The final price depends on component quality (panel and inverter brands), your location, roof type, and installer experience. Metro cities typically cost 10-15% more than smaller towns due to higher labor costs.
How long does it take to install a 5kW rooftop system?
Physical installation of a 5kW system takes 3-4 working days—structure mounting and preparation (1.5-2 days), panel installation and wiring (1-1.5 days), and testing/commissioning (0.5-1 day). However, the complete process from order to net-metered operation takes 35-80 days depending on your state. This includes DISCOM feasibility approval (7-15 days), material procurement (3-7 days), installation (3-4 days), net metering application processing (7-30 days), and DISCOM inspection and meter installation (7-15 days). Gujarat and Karnataka are typically faster (35-45 days total), while Maharashtra and Bihar can take 60-90 days.
Is net metering available for all homeowners in India?
Net metering is available in all Indian states, but specific rules vary by state. Most residential consumers are eligible if they meet these criteria: individual homeowner (not commercial), grid-connected system, system size within sanctioned load limits, and property ownership proof. Some states have caps on total solar capacity allowed in an area, and rural or weak-grid areas might face restrictions. Check your specific DISCOM’s net metering policy on their website or the state nodal agency portal to confirm availability and conditions in your area.
What documents are needed for net metering approval?
Core documents required across all states include: net metering application form (DISCOM format), latest electricity bill, identity proof (Aadhaar/PAN), address proof, property ownership proof, single line diagram of your solar system, component technical specifications, installation and test certificates, and installation photographs. State-specific additions vary—Karnataka requires electrical contractor license, Maharashtra needs electrical supervisor license, Tamil Nadu asks for building plan approval, and Delhi requires prior technical feasibility certificate. Check your DISCOM website for the exact document checklist as requirements are frequently updated.
Is DIY solar installation legal in India?
DIY solar installation is technically legal for off-grid systems, but I strongly advise against it for several reasons. For on-grid net-metered systems (which most homeowners need), DISCOMs require installation by certified electricians or MNRE-empaneled vendors. You won’t get net metering approval without proper installation certificates. Additionally, to claim the PM Surya Ghar subsidy, installation must be through MNRE-empaneled vendors—DIY installations are not eligible. Beyond legality, solar installation involves working with high-voltage DC power, structural engineering, and compliance with multiple safety standards (CEA, BIS). Mistakes can cause fires, electrocution, or system failure. Unless you’re a qualified electrical engineer with proper tools and certifications, hire professionals.
How do I compare two solar installation quotes fairly?
Create a comparison spreadsheet with these key columns: total system price, price per watt (divide total cost by system capacity), exact panel brand and model with efficiency rating, inverter brand and capacity, warranty terms for all components (panels should have 25-year performance and 10-12 year product warranty, inverter 5-10 years), itemized cost breakdown (panels, inverter, structure, cables, labor, net metering charges separately), estimated annual generation in kWh, post-installation services included (subsidy handling, net metering application, monitoring system, annual maintenance), and payment terms. The lowest quote isn’t always best—if one is 20-30% cheaper than others, investigate why. Are they using lower-tier components? Cutting corners on cables or structure? Calculate the price-per-watt for meaningful comparison, and weigh warranty quality heavily since you’re investing for 25 years.
Which solar panels are best for Indian rooftop conditions?
For Indian rooftops facing high temperatures, dust, and varying weather, monocrystalline PERC or TOPCon panels from Tier-1 manufacturers work best. Look for these specifications: efficiency 18-22% (higher is better), low temperature coefficient around -0.35%/°C or better (this matters in Indian summers), positive power tolerance (0 to +5W), and strong frame able to withstand 2400 Pa wind load. Recommended brands include Indian manufacturers like Waaree, Adani, Vikram Solar, and Renewsys, or international brands like Jinko, Longi, Canadian Solar, and JA Solar. TOPCon technology offers 2-3% better efficiency than standard PERC and performs better in heat, making it worth the 10-15% price premium if your budget allows. Avoid unbranded or Tier-3 panels regardless of price—the 25-year warranty is only valuable if the company still exists.
What are the most common installation mistakes to avoid?
Watch out for these critical errors: insufficient waterproofing at roof penetrations (causes monsoon leaks—insist on MS sealant, not cheap silicon), incorrect panel tilt angle (flat installation reduces generation by 15-20%), undersized cables (fire risk—verify 4mm² minimum for 3kW systems), poor cable management (loose cables get damaged quickly), installing inverter in direct sunlight or enclosed space (reduces lifespan), inadequate earthing (safety hazard—test resistance, should be <5 ohms), mixing panel orientations in the same string without optimization (causes 20-30% losses), skipping insulation testing before commissioning (hides future electrical faults), no rooftop DC isolator (fire safety issue), and not documenting as-built layout (makes future troubleshooting impossible). Be present during installation, take photos at each stage, and don’t sign completion certificates until you’ve verified everything on your post-installation checklist.
How do I know if my roof is suitable for solar?
Assess your roof with these checks: measure available shadow-free area (you need approximately 100 sq ft per kW, so 300 sq ft for 3kW), check orientation (south-facing is ideal, east/west works with 10-15% less generation, avoid north-facing), perform shadow analysis at different times (8 AM, 12 PM, 4 PM) throughout the year to identify obstructions from buildings, trees, or water tanks, inspect roof condition for leaks or structural weaknesses (fix before installation since panels last 25+ years), verify roof can bear load (18-22 kg per panel—typically not an issue for RCC roofs but needs checking for old or weak structures), and confirm access is safe for installation teams and future maintenance. For sloped roofs, check that angle isn’t too steep (>45° becomes difficult and expensive). Use Google Earth Pro’s sunlight feature or smartphone apps like Sun Surveyor for preliminary shadow analysis before calling installers for professional assessment.
What’s the difference between a solar EPC and an installer?
EPC (Engineering, Procurement, Construction) companies are larger firms that provide end-to-end service—they design your system, procure all components, handle installation, manage approvals, and often provide post-sales support. They typically work with standardized processes, use quality-certified components, and charge 15-20% more than local installers. Local installers are smaller contractors, often operating in specific cities, who offer more personalized service, competitive pricing, and faster response times for maintenance. EPCs offer better accountability, professional project management, and stronger warranty enforcement but can be slower and less flexible. Local installers cost less and provide personalized attention but quality varies dramatically, and there’s higher risk if they shut down. My recommendation: for systems under 5kW where cost matters, choose a reputable local installer with 5+ years in business and verifiable installations; for larger systems or if you prioritize absolute peace of mind over cost, go with an established EPC company.
Conclusion
Installing solar on your Indian rooftop is no longer a luxury—it’s a practical investment that pays for itself in 4-6 years and keeps delivering free electricity for 20+ years after that. But as you’ve seen throughout this guide, the process involves much more than just mounting some panels.
Let me summarize the key takeaways:
Before you start: Verify your roof is suitable (shadow-free, structurally sound, with enough space). Calculate your actual consumption from bills, not estimates. Size your system for peak usage, not averages. A 3kW system is the sweet spot for most Indian households consuming 300-400 units monthly.
Component selection matters: Don’t chase the cheapest quote. Invest in Tier-1 panels (Waaree, Adani, Jinko, Longi) and quality inverters (Sungrow, Growatt, Fronius). These components will run for 25 years—₹10,000 saved today could cost you ₹50,000 in replacements and lost generation later.
Choose your installer wisely: Check their experience (5+ years), visit completed installations, verify certifications, and compare itemized quotes. Watch for red flags like pressure tactics, vague specifications, cash-only payments, or impossibly low prices. For residential systems, a reputable local installer often provides better value than large EPCs.
Understand the true cost: A 3kW system costs ₹1,65,000-₹2,10,000 before subsidy. After the ₹78,000 central government subsidy, your net investment is ₹87,000-₹1,32,000. Factor in hidden costs like electrical upgrades, earthing, civil work, and DISCOM charges. Always get a “not-to-exceed” quote in writing.
Installation takes planning: Physical installation is just 2-4 days, but the full process from order to net-metered operation takes 35-80 days depending on your state. Budget time for DISCOM approvals, which are often the biggest bottleneck. Be present during installation to catch mistakes early—watch for waterproofing, proper cable sizing, earthing, and safety devices.
Net metering is crucial: This is what makes grid-connected solar financially viable. Understand how it works in your state, prepare all required documents upfront, and be patient with DISCOM inspection timelines. Once approved, your meter will run backward when you export power, offsetting your night-time consumption.
Maintenance is minimal but essential: Clean panels quarterly, inspect connections, monitor generation through your app, and schedule professional annual checkups. A well-maintained system should deliver 80%+ of expected generation with minimal issues.
The Indian solar market has matured significantly. Subsidies are robust, component quality has improved, and installers are more professional than ever. But you still need to be an informed buyer. Use this guide as your reference, ask the right questions, and don’t rush the decision.
Ready to take the next step?
Before you sign with any EPC or installer, get a personalized installation plan tailored to your home. We’ll analyze your specific situation and provide clarity on system sizing, costs, and installer options in your area.
Here’s what you’ll get:
✅ Custom system design: Based on your roof layout, shadow analysis, and actual consumption patterns—not generic templates
✅ Detailed cost estimate: Itemized breakdown with state-specific subsidy calculations, showing your exact out-of-pocket investment
✅ Installer comparison: Side-by-side evaluation of the top 3 installers in your city with verified reviews, past installations, and negotiated pricing
✅ ROI analysis: Month-by-month payback calculation showing when your system breaks even and starts generating pure profit
✅ Document checklist: State-specific list of everything needed for subsidy and net metering approvals
It’s simple: Upload your last 3 months’ electricity bills and 4-5 photos of your rooftop (from different angles). We’ll send you a comprehensive installation plan within 48 hours—completely free, no obligations.
[Upload Your Details Here] (Button/Form)
Thousands of Indian homeowners have already made the switch to solar. The question isn’t whether you should install solar—it’s whether you’ll make informed decisions that maximize your returns. With electricity prices rising 5-8% annually and solar costs at an all-time low, delaying means losing money every month.
Your journey to energy independence starts with the right information. You’ve got that now. Let’s turn it into action.
About This Guide:
This comprehensive guide was created to help Indian homeowners navigate the solar installation process with confidence. All cost figures, subsidy information, and technical specifications are updated as of 2025. However, solar policies and prices evolve—always verify current rates and eligibility with your state nodal agency and DISCOM before making final decisions.
Have questions not covered here? Drop them in the comments below, and I’ll personally answer them. If this guide helped you, share it with friends and family considering solar—informed homeowners make better decisions and drive the industry toward higher standards.
Internal Linking Opportunities:
Upward Links (to pillar/authority pages):
- Ultimate guide to solar energy in India
- Solar subsidy programs in India 2025
- How to calculate solar ROI and payback period
Downward Links (to supporting content):
- State-wise DISCOM net metering policies and timelines
- Solar panel brands comparison: Tier-1 vs Tier-2 vs Tier-3
- Solar inverter buying guide for Indian homes
- Common solar scams in India and how to avoid them
Sideways Links (to related topics):
- On-grid vs off-grid vs hybrid solar systems explained
- Solar battery storage: Is it worth adding to your system?
- How to maintain your solar system for maximum lifespan
- Solar financing options: Loans vs leasing vs cash purchase
- Real homeowner experiences: Solar installation case studies from across India
Suggested External Links (Authority Building):
- MNRE Official Portal: https://mnre.gov.in – For latest solar policies and guidelines
- PM Surya Ghar Yojana Portal: https://pmsuryaghar.gov.in – For subsidy registration and tracking
- BIS Standards: https://bis.gov.in – For solar component certification standards
- CEA Regulations: Central Electricity Authority technical standards for grid connectivity
- State Nodal Agency Websites: Links to all state renewable energy agencies
- Bridge to India Solar Reports: For market data and installation statistics
- Solar Mango Resources: For additional technical guides and installer directories
Visual Asset Suggestions: